News Flash
MANIKGANJ, FEB. 11, 2025 (BSS) -Ferry movement on the ARICHA-KAZIRHAT route in the Jamuna river resumed at 8.00 am this morning after suspending for 4 hours, Bangladesh Inland Water Transport Corporation (BIWTC) Said.
Md. Abdullah, Manager of BIWTC Aricha ghat, said that ferry operation was halted at 4.00 am due to poor visibility as thick fog blanketed the river.
However, At the time four ferries - Bir Shreshtha Hamidur Rahman,Shah Ali, Dhan Shiri And Chitra were stranded in the mid-river , loaded with vehicles and passengers.